Project Type:
Construction Inspection


Completion Date:
2014

Owner:
Town of Culpeper

Client:
Hurt and Proffitt


 

Current Projects
Project Directory

Town of Culpeper Western Interconnector Project, Colonel Jameson Boulevard

This $10.1 million project constructed a new 4 lane divided highway for Colonel Jamison Blvd. from Rte. 522 (Sperryville Pike), crossing Old Rixeyville Road and tying into existing Main St. (Rte. 15/29 and Rte. 229).

Two roundabouts were constructed as part of this project, one at Old Rixeyville Road and the other at the intersection of the Virginia Avenue and Sperryville Pike which was controlled by a traffic signal. This project was constructed concurrently with and tied into a VDOT project on existing Main St. constructing a third roundabout. Additionally, this project included a quadruple box culvert to carry Bald Run, sidewalk, a multiuse trail, overhead signs, lighting, drainage, Filterra Boxes, and mass excavation.

One unique aspect of this project was the traffic control on Sperryville Pike (a busy 2 lane road into culpeper) through the work zone while the roundabouts were being constructed. NXL’s services on this project began in the design phase providing constructability and bid-ability reviews as well as contract time determination. The services continued through the construction phase as NXL provided a construction manager as well as inspectors for the project. Additionally NXL managed all the project records including, but not limited to, RFI’s, Submittals, Work Orders, Pay Estimates, Source of Materials, Materials Book, C-107s, Workzone Safety Reports, and Daily Work Reports.